AGL- Camileri Stockfeeds
AGL Camilleri Stockfeeds, Maroota, New South Wales, Australia Design & installation of biogas utilisation facilities Date: April 2007 PMP was commissioned to design and install AGL Biogas Utilisation Facilities at Camilleri Stockfeeds, Maroota, in the state of New South Wales in Australia. The biogas generated is being utilised in the boilers on the site and CO2 emissions have been eliminated. The project included the design and installation of a 1.5mm HDPE membrane cover for an existing Lagoon for the collection process, and the design and construction of all pipework required to manage the extraction process. Extraction fans were installed to transfer biogas from the collection system to the Candle Flare for burning excess gas. Works included all associated civil works, mechanical, and electrical installation, and all interconnections. The site organic loading was an average 40,500 megalitres BOD. Combined with site hydraulic flow and capacity of the existing lagoon produced 6,500m3 per production day or 35,750m3 per week. The calorific value of the biogas produced is 24 megajoules/m3.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||