Sept 08 -April 09 |
Gippsland |
Tarago Treatment Plant |
Construct of the Tarago Treatment Plant
Victoria |
Valves, PVC SS |
|
|
| Feb - Nov 08 |
Weribee- Geelong area |
Dam lining of Agricultural
farms |
7 large water containment
liners |
1.5 mm HDPE |
|
|
| June 08 |
Factory |
Epsom (Bendigo) odour
scrubber rebuild |
Total rebuild of odour
scrubber for Epsom WWTP |
HDPE. Stainless, medias |
|
|
|
June -Sept 08 |
Monbulk- seville area Victoria |
Dam lining and vital water storage
augumentation |
7 dams for individual commercial farming
sites |
1.5mmm HDPE |
|
|
April 08-August 08 |
Western Victoria |
Wimera Mallee pipeline |
lining of 14 storage reservoirs for the
Wimerra Mallee Project |
1.5mm HDPE |
|
|
|
April 08 |
Metro Melbourne |
Melb
Metro Fire Brigade |
Lining of Underground tank at Training
centre |
1mm HDPE |
|
|
|
Feb 08 |
Healesville Vic |
Melb. Water Aqua duct PartTwo |
Channel Lining between Maroondah & Sugarloaf Reservoirs |
1.1 RPP S,Steel |
_small.jpg) |
|
| Jan 2008 |
Werribee
Market Gardens |
Mason Lane Liner |
Liner for large storage with steep batters for maximum
water storage |
1.5mm HDPE |
_small.jpg) |
|
| Jan 08 |
Cradle Mountain Tasmania |
Lothways Storage pond |
Lining of storage pond |
1.mm HDPE.
geoblanket |
_small.jpg) |
|
| Nov 07-
May 08 |
Western Victoria |
Wimmera-Mallee Pipeline |
Lining of dams along pipeline |
1.5mm HDPE |
_small.jpg) |
|
|
Oct 07 |
Indonesia |
SPM-1 |
Lining of ponds for Tapioca Waste |
1mm HDPE |
Click on PMP BioEnergy link on side bar |
|
|
May 07 |
|
Melb. Water Aqua duct Part One |
Channel Lining between Maroondah & Sugarloaf Reservoirs |
1.1 RPP |
 |
|
|
April 07 |
Silvan |
Farm Dam Liner |
Liner |
1mm HDPE |
_small.jpg) |
|
|
April 07 |
Brisbane |
AJ Bush |
Anaerobic Gas Digester |
1.5mm HDPE |
_small.JPG) |
|
|
April 07 |
Sydney |
AGL- Camilleri Stockfeeds |
Converting pre existing Anaerobic lagoon for gas collection |
1.5mm HDPE various pipework |
_small.jpg) |
|
|
March 07 |
Werribee |
Western Treatment Plant |
Repairs to covers at Werribee |
1.1 RPP |
NO PHOTO Available |
|
|
March 07 |
Dandenong Vic |
EastLink Bio Retention Units |
Lining Bio Rention systems for new Toll way |
2mm HDPE |
NO PHOTO Available |
|
|
March 07 |
Ballarat Vic |
McCains-K2 |
New pipeline for Chip factory |
PE Pipe & fittings |
NO PHOTO Available |
|
|
Mar 07 |
Cobden
Vic |
Cobden WTP |
Upgrading of pipe work between Primary & Secondary Lagoons at Cobden
WWTP |
Mechanical fittings, 315 PE pipe, earthworks |
NO PHOTO Available |
|
|
|
Feb 07 |
Bathurst |
Bathurst WWTP |
9.6Mtr Diameter tank Aerators |
uPVC |
_small.jpg) |
|
| Dec 07 |
Werribee |
Valusha Farm |
Storage Ponds for Market Gardeners |
1.5mm HDPE + pipe |
 |
|
|
| Dec 07 |
Werribee |
Farm Dam Liner |
Storage Pond |
1.5mmHDPE |
|
|
|
| Dec06-Feb07 |
Epsom Vic |
Epsom WWTP Gas Scrubber |
Fabrication of Gas Scrubber for odour
reduction at Epsom WWTP Bendigo |
HDPE Various |
_small.jpg) |
|
|
| Nov
06 |
GinGin
WA |
WestPork Piggery
|
Go Generation Plant for New Piggery
includes 4 lined ponds |
HDPE
Liner & Pipe |
_small.jpg) |
|
|
| Oct 06 |
Reservoir Vic |
VISY Paper |
Refurbishment of Tanks at VISY
Paper |
Shed 80 PVC, valves |
NO PHOTO Available |
|
|
| Jan 06- Oct 06 |
Geelong Vic |
Shell Tank Liners |
Installing membrane liners as secondary containment for Large holding tanks at Shell Petroleum |
2mm HDPE |
NO PHOTO Available |
|
| Jan +Aug 06+Jan 07 |
Port Melb Vic |
ASTA |
Mechanical Plumbing. Refurbishment of
Hawker- De Haviland in preparation of The Airbus |
SS, Mild Steel uPVC, ABS |
NO PHOTO Available |
|
|
| Aug 06 |
Silvan Vic |
Silvan
Dam Liner |
Lining of farm Dam Liner |
1.0mm HDPE |
 |
|
| May 06 to |
Port Fairy Vic |
Port Fairy WTP Augmentation |
Rebuilding of Port Fairy Waste Treatment Plant |
RPP ,steel, Piping ABS, SS |
 |
|
| April06 to June06 |
Western Treatment Plant Werribee |
Odour Reduction Plant |
Labour and piping of gas scrubbers at Western Treatment Plant |
PVC |
 |
|
| Jan06 to Sept06 |
Griffith NSW |
NUGAN Foods |
Food Process Waste Water Treatment Plant |
1mm & 1.5mm HDPE membrane |
 |
|
| Jan06 to May06 |
Deer Park |
Witchmont Winery |
Design & construct of Organic type WWTP using concrete septic tanks & Peat Bed Filtration system for Winery Restaurant, liaison with EPA through license & approval process. |
Environmentally stable products |
 |
|
| Feb06 |
Silvan |
Sweetwerries farm |
liner for Strawberry Farm |
1 mm HDPE membrane |
 |
|
| Dec05 |
Altona |
Dow Chemicals |
Bund lining of tanks at Dow Chemical Plant |
1.5mm HDPE |
 |
|
| Jul05 to Dec05 |
Werribee |
AGL |
Location of services & supply & weld of PE gas Line |
280 + 315 PE Pipe |
 |
|
| Nov05 |
Port Fairy |
Southern Ocean Mariculture |
Supply and fabricate PE pipelines in factory & on site for aquaculture plant |
630 + 315 + 250 PE pipe + fittings |
 |
|
| Jul05 |
Carrum Downs |
Eastern Treatment Plant |
Relining of treatment tank at Eastern Treatment Plant |
.9 PVC |
 |
|
| Jul05 |
Echuca Vic |
Echuca UASB cell No.2 |
Supply and install 1.1 RPP cover suspended from concrete roof of 10ML anaerobic tank for gas collection and HDPE lining of lagoon overflow flume. |
1.1 Re-enforced Poly propylene |
 |
|
| May05 |
Ballan Vic |
Central Highlands |
Repair & clean to existing poly prop cover at Ballan for Central Highlands
Water |
1.1mmRPP |
 |
|
| Apr05 |
Ararat |
Ararat Abattoirs |
1.5mm HDPE Cover over waste pond |
1.5mm HDPE |
 |
|
| May05 to Feb06 |
Melbourne |
Aurora Project |
Mechanical Plumbing. Supply & Install pipework |
ABS, PVC, HDPE |
 |
|
| Apr05 |
Yallourn |
RTL Ash Ponds |
Installation of Liner for 2 ash ponds at Yallourn W power station |
1.5mm HDPE |
 |
|
| Mar05 |
Werribee |
Werribee curtain |
Fabrication & installation of separation curtain at Melb Water Treatment Plant
Werribee |
1.5mm HDPE PE Pipe, SS cable & fittings |
 |
|
| Feb05 |
Gippsland area |
Gippsland Water repairs |
Repairs & installation of walkways to various Gippsland Water Reservoirs |
PP |
 |
|
| Jan05 |
Bass Strait |
Origin Oil rig pipe line |
Supply & weld PE pipe on Oil rig in Bass Strait for Origin Energy |
PE Pipe |
 |
|
| Mar05 to Jul05 |
Melb suburbs |
Melb Water Chlorination Plant Upgrades |
Upgrades of four Chlorination Plants in Cardinia, Greenvale, Frankston and Dromana for Melbourne Water |
Plumbing |
 |
|
| Dec04 to July05 |
Tynong Vic. |
Melb Water Tynong Chlorination Plant upgrade |
Upgrade of the Tynong Chlorination Plant for Melbourne Water |
Plumbing |
 |
|
| Sep04 to Feb05 |
Carrum Vic |
Topaq Interim Treatment Plant |
Supply and Installation of ABS, HDPE, PVC, poly propylene, Copper and small diameter Stainless Steel process piping and related valves, pumps, flowmeters, equipment and pipe supports at the Topaq Interim Reuse Treatment Plant |
ABS, HDPE, PVC, PP, Copper, and SS pipework |
 |
|
| Nov04 |
Geelong |
ANCO SEED |
Supply & install 1mm HDPE liner for ornamental pond at Restaurant. |
1mm HDPE |
 |
|
| Nov04 to Dec04 |
Sugarloaf Reservoir, Vic |
Winneke Dry Polymenr Batching System |
Supply and install a dry polymer batching system vaccume transfer unit, dissolving equipment, ejector & pipework, preparation/maturing tanks and dosing tanks load cells for weight monitoring and all associated electrical switchboard and equipment coupled into existing system |
Plumbing |
|
|
| Oct04 to Nov04 |
Black Rock Vic |
Black Rock Recycle Lagoon |
Supply and install a dry polymer batching system vaccume transfer unit, dissolving equipment, ejector & pipework,preparatio/maturing tanks and dosing tanks load cells for weight monitoring and all associated electical switchboard and equipment coupled into existing system |
1.5mm HDPE |
 |
|
| Oct04 to Nov04 |
Lilydale Vic |
Lilydale Sludge Lagoon |
Installation of 1.5mm HDPE liner to sludge holding lagoon at Lilydale Wastewater treatment plant |
1.5mm HDPE |
 |
|
| Feb04 to Aug04 |
Echuca Vic |
Echuca UASB cell |
Supply and install 0.9mm XOR cover suspended from concrete roof of 10ML anaerobic tank for gas collection and HDPE lining of lagoon overflow flume. |
0.9mm XOR (Aeon) |
 |
|
| Aug04 to Sep04 |
Nathalia Vic |
Nathalia Water Treatemnt Plant Upgrade |
Design, fabricate and install 1.14mm Hypalon membrane cover to water storage including access hatches and ancillaries. Other works included inlet extension, and filter bypass. |
1.14mm Hypalon |
 |
|
| Sep04 |
Corowa |
QAF Piggery |
Complete lining & gas collection project |
HDPE |
|
|
| Jul04 to Aug04 |
Sugarloaf Reservoir, Vic |
Rehabilitation of Alum Storage tanks |
Design, supply and install 1.5mm BLR liner to two 10ML in ground Alum Tanks for Melbourne Water. Construction includes removal of leaking cast-in PVC liner and installation of new liner all with under confined space entry conditions. |
1.5mm BLR (Aeon) Liner |
|
|
| Feb04 - Aug04 |
Serpentine |
Bears Lagoon Piggery |
Design & construct Liner + cover to effluent lagoon |
HDPE |
 |
|
| Apr04 |
Swan Hill |
Buronga winery |
Channel Liner |
1.5mm HDPE |
 |
|
| Nov03 |
Sale |
Sale Prison |
Supply and install liner to two 5ML steel clear water Tanks. Construction included removal of existing leaking liner. |
0.9mm PTR PVC |
|
|
| Oct03 |
Gippsland Vic. |
Yallourn W Power Station |
5 Kilometres of 315 + 280pipe welding |
PE pipe |
|
|
| Oct03 |
Bairnesdale Vic |
Patties Pies |
Lining of Fire Retention Pit for Pie Factory |
1mm HDPE membrane |
 |
|
| Sep03 |
Lang Lang Vic. |
Bass Gas |
315 + 200 Pipe welding 2.0mm Membrane supply + install |
PE pipe + Membrane |
|
|
| Jul03 |
Woolert Vic. |
Pioneer Landfill |
Lining of disused tip site total coverage 35000M2 |
1.5mm HDPE |
|
|
| Jun03 to Sep03 |
Warrigal Vic |
Sth Warrigal basin |
Liner & Cover of Sth Warrigal storage Basin & associated works |
1.1 RPP+ 1.0 UPP Membranes |
 |
|
| Feb03 to Jul03 |
Clayton Vic. |
Clayton Landfill |
Lining of disused tip site total coverage 25000M2 |
VFPE Very Flexible Polyethylene |
|
|
| Sep02 to Oct03 |
Shepparton Vic. |
Shepparton WWTP NSC2 |
Bio gas extraction and flare at the Shepparton Waste Water Plant |
Stainless steel |
|
|
| Sep02 to Oct04 |
Shepparton Vic. |
Shepparton WWTP NSC3 |
Chemical
dosing of Bio reactor for Anerobic digestion |
ABS,
HDPE, PVC, PP, Copper, and SS pipework |
|
|
| Oct02 to Dec02 |
Maitland
SA |
AWB |
Base
cell for Wheat storage silo |
Hdpe
PP Upvc and Electrical |
|
|
| Oct02 to Dec02 |
Hastings
Vic. |
Esso |
secondary
containment and base protection to fuel storage tank 35mtr dia x 22mtrs
tall |
Hdpe
1mm textured |
|
|
| Oct02 to Feb03 |
Carrum
Vic. |
Sandhurst
Estate |
welding
irrigation pipe work for new estate and golf course 450mm to 160mm |
PE
Pipe |
|
|
| Dec02 to Aug03 |
Central
Victoria |
WWTP |
Refurbishment
of Water treatment Plants for Coliban Water.
Rochester, Cohuna
& Boort |
ABS,
HDPE, PVC, PP, Copper, and SS pipework |
|
|
| Jan 03 to Jul03 |
Central
Victoria |
Bears
Lagoon
Piggery |
Design
& Construct WWTP (including provision for Co-generation) for 28,000
head piggery |
ABS,
HDPE, PVC, PP, Copper, and SS pipework |
|
|
| Feb03 to Jun03 |
Central Victoria |
WWTP |
Refurbishment of Water treatment Plants for Coliban Water. Rochester, Cohuna & Boort |
ABS, HDPE, PVC, PP, Copper, and SS pipework |
 |
|
| May02 to Jun02 |
Main
Ridge Vic |
Main
Ridge Dam |
Design
construction of 5000m2 1.0mm HDPE reservoir liner. Acting as a nominated
subcontractor to main contractor |
1.0mm
HDPE Liner |
|
|
| May02 to Jun02 |
Werribee
Victoria
|
Werribee
Channel Replacement |
Replacement
of sections of irrigation channel with 650m of 1000mm and 800mm HDPE
Buttwelding, and 550m and 400mm 315mm, Including prefabricated bends, tees
and flanged fittings, works successfully completed during short shut down
periods. |
HDPE
pipepork |
|
|
| May02 to Jun02 |
Pyramid
Hill Vic |
Ozimeats |
Process
review, rehabilitation and upgrade of existing WWTP for Ozimeats. Review
and recommendation included consultation with EPA and proposals for work
to be undertaken. Works completed under this contract included the lining
of two lagoons, prefabricate 1.0mUPP liner, and 3000m2 1.0mm HDPE liner |
1.0mm
HDPE Liner, 1.0mm UPP Liner |
|
|
| Dec01 to Jun02 |
Port Fairy Vic |
Port Fairy WWTP Upgrade |
Design, construction and commissioning of mechanical and electrical equipment upgraded for the Port Fairy WWTP. Design included a inlet injection system for the LRAL lagoon, hazardous area analysis, instrumentation and
controls, and heating system to maintain temperatures in the lagoon at a
constant 30 Deg C. Construction included supply and installation of
heating system and variable speed pumps for the recirculating effluent
utilising Biogas from the LRAL supplemented with LPG. Scope also included
supply of switchboards and field wiring, control and automation system using CITECT. |
ABS, HDPE, PVC, PP, Copper, and SS pipework |
 |
|
| Jun02 |
Epsom Vic |
Gas Scrubber |
Fabrication and installation of Gas scrubber for Epsom Treatment Plant Central Victoria |
HDPE, Fibreglass |
 |
|
| Dec01 to Jun02 |
Griffith NSW |
Terra Nova WWTP |
Design, construction and commissioning of a total waste water treatment system.
Contract included process liability, installation and commissioning of
flare, and supply and installation membrane for Anaerobic, Aerobic and
winter storage lagoons |
1.0mm HDPE Liner, 1.5mm HDPE Cover |
 |
|
| Nov01 to Dec01 |
Berwick
Vic |
Hallam
Bypass |
Supply
and installation diversion of 315mm HDPE
gas transmission line in preparation for the Hallam Highway Bypass |
315mm
HDPE Pipeline |
|
|
| Apr02 to May02 |
Nagambie
Vic |
Nagambie
Composting Facility |
Design,
prefabrication, supply and installation of 3500m2 liner to the floor of a refurbished Treated Effluent
Lagoon. The 1.0mm UPP liner was welded to a castin Poly Propylene
waterstop the aeration slab. |
1.0mm
UPP Liner |
|
|
| May01 to Feb02 |
Bendigo
Vic |
Aqua
2000 Sandhurst |
Supply
and Installation of ABS, HDPE, PVC, poly propylene, Copper and small
diameter Stainless Steel process piping and related valves, pumps,
flowmeters, equipment and pipe supports at the Sandhurst Water Treatment
Plant Bendigo |
ABS,
HDPE, PVC, PP, Copper, and SS pipework |
|
|
| Jun01 to Jul01 |
Seville
Vic |
Bunge
Meat |
Design
and modification of waste treatment for Bunge Meat's Seville Piggery (x
pigs) to meet EPA's stringent requirements. Construction of 1.5mm HDPE
Cover for Odour control HDPE pipework modifications and construction of
foul air beds |
1.5mm
HDPE Cover |
|
|
| May00 to Jul00 |
Mallee
Vic |
Wimmera
Mallee Water |
Irrigation
channel liners to various sites throughout the Mallee region designed to
reduce loss of water |
LDPE
& Pp Liners |
|
|
| Apr01 to May01 |
Altona
Vic |
Dow
Chemical |
Lining
of an existing dike containing a 1200m3 Tank for Dow Chemical's
Hydro Carbon Storage Tank Farm. Bund lining with geotextile and
1.5mm HDPE liner amongst existing pipework. |
1.5mm
HDPE Liner |
|
|
| Oct00 to Nov00 |
Altona
Vic |
Qenos |
Involved
in initial design of stormwater treatment process for Qenos Lining with
1.5mm HDPE liner for Storm water treatment basin and welding of HDPE
pipework |
1.5mm
HDPE Liner |
|
|
| Mar01 to Jul01 |
Ballarat
Vic |
White
Swan Remedial work |
Emergency
reinstatement of liner to restore the water supply to Ballarat. New 1.0mm
UPP liners were installed in the clearwater storage basins consecutively
with short down times. PMP scope included large scale prefabrication of
liner panels to meet the tight time frame and removal and reinstatement of
the cover. |
1.0mm
UPP Liner |
|
|
| Jul00 to Nov00 |
Pyramid Hill Vic |
RMIT Solar ponds |
Assisted in the initial concept design and later the construction of a 4000m2
demonstration solar pond with the objectives of producing heat for use in
commercial salt drying and to monitor and evaluate the technical
performance and economic viability of this renewable energy source.
Construction works included earthworks, supply and installation of a
membrane liner, leak detection and associated concrete structures.
Assisted the client in achieving its specific requirements with in the
limited financial constraints their grant. |
1.0mm UPP Liner |
 |
|
| Aug00 to Sep00 |
Botany
NSW |
Orica
Botany Chlor Alkali Storage – Secondary Containment |
Secondary
containment of Chlor Alkali Storage for Casebee Pty Ltd on the Orica
Botany site. Development and implementation of a flexible work method to
accommodate concrete construction, backfill and other works. Installation
of an intricate XL75 membrane liner as a secondary containment. |
XL75
Secondary Containment |
|
|
| Apr00 to Aug00 |
Yarram
Vic |
Yarram
3.4ML Service basin |
Design
and construct contract for a 3.4ML potable water storage facility upgrade
for South Gippsland Water, including extensive modifications to pipework,
new inlet, outlet, overflow and underdrainage structures and membrane
works for liner and floating cover. |
1.0mm
UPP Liner 1.14mm RPP cover |
|
|
| May00 to Sep00 |
Shepparton
Vic |
Tertiary
treatment plant at the Shepparton WWTP |
Mechanical
services, process pipework installation for the tertiary (Actiflow) waste
water treatment plant for OTV Kruger. The client was given extensive
assistance in exploring alternative piping materials to meet budget.
Pipework installed varied in size from 600mm to 25mm and materials include
Stainless steel, ABS, PVC, HDPE, Carbon Steel, and Galvanised Steel. |
SS,
ABS, PVC HDPE, Carbon Steel, Galvanised Steel Pipework |
|
|
| Feb00 to May00 |
Ballarat
Vic |
Ballarat
Water Treatment Plant – Storage Basins liner and Covers |
Design
and construction of liners and floating covers for two 12ML clear water
storage’s for Clough Engineering Limited. The project objective was to
improve the quality of potable water supplied to Ballarat. The Scope of
PMP’s works included design and installation of all membrane works,
offsite prefabrication of membrane panels to meet program timeframe and
inlet outlet & overflow concrete structures. |
0.75mm
UPP Liner 1.14mm RPP cover |
|
|
| Dec99 to May00 |
Mulgrave
Vic |
Australian
Water Technology |
Design
and Construction of a trial plant for Aquiculture farming - Mechanical
installations and filtration |
Mechanical
pipework |
|
|
| Apr99 to Nov99 |
Tyabb
Vic |
Tyabb
Reservoir Liner and Floating Cover |
Design
and construct contract for the upgrade of a 320ML potable water storage
facility for Melbourne Water/GHD, which supplies the Mornington Peninsula.
Works included bypass connections, earthworks preparation, concrete
structures, HDPE pipe welding up to 1m diameter and 140,000m2 of membrane
works. Conceptual design was
also undertaken and is still being considered by the client for the
inflation of the cover as an alternative for cleaning and maintenance
works. |
1.1mm
RPP Liner 1.14mm RPP cover Civil Works, Pipework Modifications HDPE pipe
up to 1m Dia |
|
|
| Apr99 to Nov99 |
Tatura & Mooroopna Vic |
Tatura & Mooroopna Waste water Facility |
Design and construct contract for 34,000 m2 of membrane covers including all
associated piping, civil and mechanical works including the flaring of up
to 1500m3/hr the gas to 0.5ppm sulphide content for Goulburn Valley Water/
CMPS&F. PMP contract a major portion of the overall project which was
awarded "Enviromental Engineering Excellence" by the Institute
of Engineers. |
1.14mm RPP, Mechanical pipework & Flare |
 |
|
| Jul98 to Dec98 |
Daylesford
Vic |
Daylesford
Water Reticulation System |
Rehabilitation
of 3 potable water storage reservoirs (one registered with the National
Trust) for Central Highlands Water Board as a specialist sub-contractor.
The installation of liners to the basins was completed within critical
time frames required. |
1.0mm
UPP Liner |
|
|
| 98 |
Yinnar
– Boolarra Vic |
Yinnar
- Boolarra rising main |
Enetech
/ Streamline Australia complete installation and pipeline welding of
8,000m sewer rising main Yinnar -
Boolarra |
315mm
Pipe |
|
|
| 98 |
Trafalgar
– Moe Vic |
Trafalgar
- Moe rising main |
Enetech
/ Streamline Australia complete installation and pipeline welding of
14,800m sewer rising main Trafalgar - Moe |
200mm
HDPE Pipe |
|
|
| Jul97 to Oct97 |
Berwick,
Broad- meadows Vic |
EDL
Limited Gas transmission line |
Supply
and installation of 8000m (Broadmeadows to Epping) & 14,140m (Berwick
to Lyndhurst) of 315mm HDPE gas
transmission line in a construction period of 13 weeks |
315mm
HDPE Pipeline |
|
|
| Apr97 to Jun97 |
Cowes
Vic |
Westernport
Water |
Slip
lining of 400m of 180mm sewage transfer line with HDPE pipe through the
main street of the Cowes. |
HDPE
Pipe |
|
|
| Jan97 to Jun97 |
Ballarat
Vic |
McCain
Foods Anaerobic Lagoon |
Initial
assistance with design and later Construction of a 28ML HDPE lined and
covered anaerobic lagoon, including 1500m associated process pipework,
mechanical pipeline installations and valves for McCain Foods, Ballarat. |
HDPE
Liner & Cover And associated pipework |
|
|
| 1997 |
Yarraville
Vic |
Orica
– Sulphuric Storage Secondary Containment Yarraville. |
Supply
and installation of liner to the secondary containment cell for the bulk
sulphuric storage facility at Yarraville. PMP involved in the detail
design of the liner with regards to the functionality of anchor trenches
and theoretical performance of installation in the event of a major spill.
Project completed in a timely manner with the construction schedule. |
PP
Liner |
|
|
| 1996 |
Lyndhurst
Vic |
Sita
– BFI Landfill, Lyndhurst |
Supply
and installation of leachate collection sumps for the base cell and
ancillary leachate pipework |
2mm
HDPE |
|